2020年1月2日星期四

GDF Flange Forming Machine

Model No.: GDF-T20/30,DGDF-T20/T30
Max Thickness: 0.5-0.8mm(21-26ga)
"a"Size: 20±0.5,30±0.5
Min.Order Quantity:  1 Set
Supply Ability: 10 Sets per Month
Port:  GUANGZHOU PORT,SHENZHEN PORT
Payment Terms:  T/T,L/C

GDF Flange Forming Machine Products Information

GDF integral flange is widely applied in Europe as a kind of quick installation duct flange. It shares common advantages with TDF flange—well seal, free of jointing and rivet. GDF flange is integral with duct, with 4 bolts and special duct corner and clamp.

COMIFO Group specializes in duct machines manufacturing, contracting and selling HVAC air conditioning equipments, HVAC machinery, valve and actuators,air duct machine,air duct manufacturing. We are one of the most professional flanging machine manufacturers in China. Just contact us!




2020年1月1日星期三

FLANGE FORMING MACHINE

There are mainly two kinds of flange systems of duct connection. American standard and European standard, which is TDF flange recommended by SMACNA association and TTF/LT mate flange as well as improved GDF flange recommended by British Refrigeration Association. Comifo knows flange structure very well, and quite familiar with the standards of duct pressure test and leakage test, including SMACNA, DW144/142, GB50243-97 standards. We are one of the most professional flange machine manufacturers in China. Comifo tdf flange forming machine can satisfy different requirements in different markets.

Comifo flange machine adopts heavy duty underpan, arc welding frame, high grade motor, high precision bearing, thermal refined and grinded roll shafts. Its reliable transmission system is free of maintenance. The surface panels have been spray painted.

The air duct flange machine has independent hydraulic system and electrical control system, which has the advantages of small size, low energy consumption, high efficiency, no noise, etc. In addition, it is easy to install and unload, simple to operate, strong carrying capacity, long life, etc. The air duct flange machine must be put in a dry place, can't let the rain or other impurities into the machine, used for a period of time to add the lubricating oil, make the machine more convenient operation, want to be in a specific time to check the nut in the fuselage, because in the use process is too long will cause the nut loose, so be sure to check regularly, to ensure safety in production, in a certain time for cleaning, make the machine to enhance vitality. Because the duct flange machine needs to work all the time, if you pay attention to maintenance, the efficiency will be reduced and the life will be reduced. The followings are the precautions for the daily maintenance of the duct flange machine.

1. If it is found that there are irregular noises during operation, stop the machine immediately.
2. Test the motion after turning on the power to see if there is any jam.
3. Operate the machine according to the rules strictly.
4. Working cooperatively is required to each operator. Operation cannot start if the commands are not received.

COMIFO Group specializes in air duct machine manufacturing, contracting and selling HVAC air conditioning equipments, HVAC machinery, valve and actuators,air duct machine,ductwork machine. RFQ today!



2018年11月21日星期三

Container duct auto line VI



Container duct auto line VI with the feature of small size, firm structure and easy for installation, it can be used in the construction site to fulfill the ideal of movable operation and processing.
Duct Machine丨Duct Machinery
Web:
http://www.gzcomifo.com
E-mail:comifo@21cn.net
WeChat:18988833035

2018年4月11日星期三

Global HVAC market will increase by 5% over the year

The global construction market is pursuing different ways of improving energy efficiency, and actively investing in energy efficiency solutions to meet the increasing cost of energy, while not lowering the quality of service. The commercial sector is adopting more green systems in the building to enhance the comfort and efficiency of the indoor environment, improve energy efficiency and reduce the impact on the external environment. As a result, these systems can receive energy and environmental design (LEED) certification or energy star certification.
Analysis and forecast, in the 2017-2021 years period, the global HVAC pipe market will increase by 5.25% CAGR (CAGR). Heating, ventilation, and air conditioning are among the most energy intensive systems in commercial and residential buildings. Ventilation ducts are used for air distribution in HVAC systems. The ventilation, return air and exhaust air necessary for a HVAC system are required through the air duct. Ducts are also used for ventilation. As a result, the air duct is also a method of ensuring indoor air quality and thermal comfort.
The development of the construction industry has greatly promoted the global HVAC duct market. New buildings in residential, commercial and industrial areas have increased the demand for HVAC systems, thus creating demand for wind pipes. Architectural design innovations and concerns about building energy efficiency have created a good opportunity for HVAC manufacturers to expand their market size.
At the same time, the HVAC market is a capital intensive industry, which limits the wider use of HVAC systems, which has had a negative impact on the air duct market. Suppliers of HVAC market are faced with the difficulties of equipment development and market development. Many end users are also very much involved in the purchase of HVAC equipment because it requires a lot of initial investment. Especially in developing countries, high costs have prevented many families from buying household fireplaces, air conditioners and other electrical equipment.
SIG dedicated to the manufacture of wind pipe production line for nearly 20 years, has rich experience in equipment manufacturing, the production of automatic air pipe production line performance stability, high efficiency, can meet the demand of the wind pipe manufacturers growing, to create more economic benefits for wind pipe manufacturers.

Precautions for maintenance of duct production line
The normal operation and operation of the duct production line can not be separated from the normal operation of the air duct machine. Therefore, in order to ensure the normal operation of the machine, and ensure that the daily air duct production does not stop failure, it is necessary to maintain and maintain the pipe production machine. Comifo, the duct production line manufacturer, said that the maintenance of the duct line should be carried out from all aspects
1, for the duct cleaning system, flexible pipe material requirements are relatively high, must have dustproof, airtight, smooth and so on. The connection between the pipe and the duct equipment must be more strict. And the appearance of the tuyere requirements are more stringent, the quality should be qualified, border and blade to be smooth and smooth.
2, in the production of air valve, there should be signs of opening and closing. Multi blade valve blade joints need to overlap consistent, and wheelbase deviation in less than 1mm. For flexible pipe, the tightness should be suitable, the length should be within the scope of construction specifications, and meet the design requirements. Cracking and twisting are not allowed.
3, the hood production requirements, the specific performance of the complete rules, keep balance of shape, size deviation within 2mm per meter. Fire valve rotating parts need corrosion resistance is very strong, and its close to tight airtight.
Structure and function of fire damper
What are the structures and functions of fire dampers?
On the air duct of the air conditioning system, the purpose of the installation of fire dampers is to quickly cut off the air flow in case of fire, so as to prevent the fire from spreading. The fire valve diagram, when the fire duct, influence by ambient temperature and temperature, so that when the fire duct reaches a certain temperature, the fusible film fuse, the valve plate connected by the original fusible film and then fusible film closed stop airflow through off. In order to stop supplying air to the system and to install electrical signals and interlocks on the fire damper, the valve plate will signal when it is closed so that the fan will stop running.
Fire valve installation position:
(1) the main air duct on the air outlet of the air conditioning equipment (fresh air unit, unit, etc.).
(2) air passage through fire compartment.
(3) the air passage passes through the expansion and subsidence joint of the building structure.
(4) air passage, in unavoidable circumstances, through flammable workshops or rooms. The fire valve can be divided into self tipping, fire control valve type, manual reset, fusible film movement temperature is 70 DEG C.

2018年4月3日星期二

Top 10 precautions for central air-conditioning duct installation

1.Duct arrangement should adopt the method of laying along the wall as far as possible, so that in the final when decorating, can form concave and convex structure, not only keep the interior clear height, and blocked duct, and can have good decoration effect.
2. The wind pipe should be as short as possible in the layout, not too much elbow, not too small in the corner radius, and try to avoid the pipe mutated diameter to reduce the loss of the pressure along the path.
3. The structure of the original building should not be destroyed when the air duct is installed, especially the bearing structure.
4. The duct passes through the wall, and the cracks around the hole should be filled with elastic materials.
5. In order to reduce the noise, the starting end of the duct (with the fan connection) should not be curved. When necessary, the guide blade should be installed in the elbow and the three-way branch.
6. The connection of the air duct shall be strictly regulated, and the paste shall be firm, laid should be flat, and the binding shall be tight, without slip, relaxation and fracture, to prevent leakage (heat).
7. Air duct which can produce air of condensate, must be installed according to the slope of the design.
8. The installation shall be strong. All lifting, supporting and supporting bracket shall not obstruct the operation of the tuyere, valve, control system and inspection door, and shall be treated with good rust.
9. The installation of the new wind tube shall be in accordance with the requirements of the installation of the air duct machine, and the installation of slope shall be made according to the design requirements (slope to the new port).
10. The new breezes should be equipped with rainproof and filter cover, and the installation location should be free of air pollution and easy to repair.

Notice for production of air duct production line
The air duct production line does not work independently. It exists and operates as a whole production line system. From the volume of material, the process of forming the wind pipe by the machine processing equipment is complete, any part of the end of Chengdu without wind pipe production line, in the operating process to follow the instructions to complete the operation procedures, and pay attention to the following matters.
1. before work, check all parts of the equipment, data and system is in good condition, and open empty car test. It is strictly forbidden to operate without overload. Equipment for wind pipe production line must be operated by hand and cooperate with each other.
2. the operation of the air duct production line must be performed by professional technicians. Other non personnel are prohibited from working near the pipe line.
3. material selection issues. In the design, manufacture and maintenance, the materials should be selected according to the nature and characteristics of the parts. The material of the wind pipe production line is strictly prohibited from wearing, corrosion, excessive deformation, fatigue, rupture and aging products.
4. assembly quality problems. In this condition, a reasonable initial clearance is required. If the initial gap is too large, the effective life cycle will be shortened; in addition, the accuracy of the position between the parts in assembly is also very important, and if not meet the requirements, it will cause additional stress, partial wear and other consequences.
5. proper maintenance. According to the reasonable process, cost-effective and the principle of possible production, reasonable maintenance and quality maintenance. It is necessary to rationally select and apply the repair process, pay attention to the preparation before the repair, and perform the operation according to the regulations and repair after the repair process.